日韩黄色免费观看丨久草日b视频一二三区丨三级在线看中文字幕完整版丨成年人拍拍视频丨在线看片资源丨亚洲国产五月综合网丨亚洲天堂一区二区丨91综合精品丨巨爆乳中文字幕巨爆区巨爆乳无码丨国产成a人亚洲精v品在线观看丨九九激情视频丨日韩日比视频丨欧美在线免费丨一区二区不卡免费视频丨水蜜桃av无码一区二区丨国产a级网站丨91美女图片黄在线观看丨精品国产乱码久久久久久红粉丨韩国三级视频在线丨伊人久久大香线蕉成人丨免费午夜理论不卡丨一区二区免费视频中文乱码丨色av影院丨久久久激情视频丨丰满少妇被猛烈进出69影院

Hello! Welcome to the official website of Chuangpuda! Hello, Welcome!

Message 023-8111-1118

Carbon dioxide gas expansion construction of Xiushan County Fuxing Sand and Gravel Co., LTD

Xiushan County Fuxing Sand and Gravel Co., Ltd. is located in Group 3, Shamao Village, Xiaoxi Township, Xiushan County, Chongqing City. The project mines ore for use as auxiliary stones for train tracks.

The rock at the construction site is quartz sandstone, which is resistant to wear, pressure and weathering. The hardness of the quartz sandstone is 85 degrees, which is both hard and sticky. Even if the blasting machine continuously strikes this sandstone for more than ten minutes, it can only form a white mark. The mining difficulty is extremely high. Four teams of drilling machines were invited successively, but all found the operation difficult and thus could not proceed. This kind of hardness cannot be exploited by manual or mechanical means, and the vibration and noise caused by the blasting method are relatively large. Therefore, a special new process of carbon dioxide cracking is adopted.

Carbon dioxide fracturing utilizes the vaporization and expansion of liquid carbon dioxide upon heating, rapidly releasing high-pressure gas to break rocks. This approach overcomes the shortcomings of previous blasting mining and pre-cracking methods, such as high destructive power, high danger, and the crushing of ore bodies, providing a reliable guarantee for safe mining and pre-cracking in mines.

Chongqing Chuangpuda Machinery Technology Co., Ltd. conducted an investigation of the construction site and formulated a detailed construction plan: We drilled 25 holes a day and a half, installed 25 pipes, and the open face height of the site was about 7 meters. We drilled with a 3.5X3.5X4 meter straight row drill, strictly controlled the size of the drilled holes and the corresponding size of the straight row drill, and the final result measured by the boss (crack 鏠 size) was 35m x 6m x 5.5m total 1155 cubic meters, each pipe output 46.2 cubic meters.

The problems such as the high difficulty of mining have been successfully solved. While the output has increased, safety has also been guaranteed.